Flyovers & Junction Improvements where work is completed - S. V. Road Junction on Western Express Highway
Location At the junction of S. V. Road & Western Express Highway of Mahim Causeway.
Cost of Work Rs. 15.95 crores
Agency M/s. UPSBC Ltd.
Date of Starting 10-06-96
Date of Completion 05-05-99
 
   
Salient features of the Bridge  
Total length of bridge 670 meters
a) Bridge proper 287 meters
b) Width of Bridge 383 meters
Width of Bridges The Bridge is four lane wide having bridge width of 16.5 meters and carriageway width of 15.2 meters.
Spanning Arrangements The spanning arrangement for the above bridge
Two obligatory spans for vehicular traffic one at S.V. Road Junction 40m and other obligatory span Reclamation side of 40 m.
Total 8 spans
Foundation At 3 locations piles
At 6 locations open foundation
Substructure Circular piers in M 40 concrete
Superstructure The obligatory span of 49 Meter length is constructed as prestressed Box girder and the other span are contructed as RCC box girder
 
   
Total 1,14,000 vehicles are plying on the junction. Due to construction of this flyover, @ 50,000 vehicles traveling from to Western Express Highway & S.V. road junction will be able to ply freely without waiting for signal. This will result into saving of Rs. 2.92 crores per year in fuel alone. Other benefits such as savings in travel time reduced accidents etc. will also accrue on account of this fly over.
 