English  |  Marathi      
 
 
         
 
MSRDC - Project - Baramati IRDP, District Pune
1) Salient features :- The Project consists of 3 Packages.  
  The total cost of the Project is Rs. 25.00 crores.
 
The various works to be undertaken under this Project are - widening and strengthening of roads, construction of new roads, cross drainage works, improvement and beautification of major junctions, construction of bridges, plantation etc.
   
 
   
1.1 Project cost and construction schedule  
 
Sr.
No.
Package Cost
(Rs. estimated)
Time limit
1 Road Package I 15.81 12 months
2 Road Package II 13.54 12 months
3 Bridge Package III 4.22 12 months
  Total...  33.57  
 
   
 
   
1.2 Important Project parameters.  
Part I - Roads.
 
Sr.No. Road Chainage Length
Km.
Remarks
    From To    
1.1
Ring Road
a) Section 1
b) Section 2
c) Section 5
d) Section 4
 
0/000
0/000
0/000
0/000
 
0/975
0/900
1/830
2/130
 
0.975
0.900
1.830
2.130
All the works are completed and opened for traffic.
2.1 S.H.66 Indapur - Nira Road. 47/400 51/800 4.400
2.2 S.H.68 Bhigwan Road 0/000 4/000 4.000
2.3 S.H.10 Patas-Phaltan Road 38/500
41/720
39/770
42/600
1.270
0.880
3.0 MDR 65 Jejuri Road 47/500 49/030 1.530
4.0 Internal Municipal Roads     2.800
  Total...      21.065
 
   
 
   
  Part - II .: Bridges 3 Nos.
 
5.0 Bridges Remarks
5.1 Construction of new river bridge across River Karha All the works are completed and opened for traffic.
5.2 Dismantling of existing bridge and construction of new canal bridge at canal CH. 78/100 (approx.) All the works are completed and opened for traffic.
5.3 Widening of existing bridge Khandoba Bridge.
Existing Bridge is 9.65 m. wide and 90 m. in length (approx.)
All the works are completed and opened for traffic.
 
   
 
   
All rights reserved Copyrights © 2007 msrdc.org