| SALIENT FEATURES |
| 01. |
Value of Contract : |
Rs. 42 Crore |
| 02. |
Date of commencement of work : |
May 26, 1999 |
| 03. |
Date of completion / Opening to Traffic : |
Feb 26, 2003 |
| 04. |
Length of Fly-overs (viaducts) : |
585 + 640 = 1225 Mts. |
| 05. |
a) |
New Fly-over on South side of existing fly-over- |
i) |
6 Spans of 33.33 Meter long twin box girder structure |
| |
|
ii) |
1 Span of 49.62 Meter long twin obligatory Span box girders structure |
| |
|
iii) |
1 Span of 43.93 Meter long twin obligatory Span box girders structure |
| |
|
iv) |
Ramps on Kalanagar side : 140 Mts. |
| |
|
v) |
Ramp on Worli side : 109 Mts. |
| |
|
vi) |
Clover leaf Ramp `A’ : 240 Mts. |
| |
|
vii) |
Clover leaf Ramp `B’ (Slip Road) : 308 Mts. |
| |
|
viii) |
Cloverleaf Ramp `E’ : 640 Mts. |
| |
|
ix) |
Clover leaf Ramp `F’ (Slip Road) : 410 Mts. |
| |
b) |
Extension of Existing Fly-over- |
3 spans of 33.33 Mts. length extended in continuation of the previous structure of fly-over build under 50 Flyover Project This extension is parallel to the New Fly-over. |
| 06. |
Carriageway : |
Four Lanes two Way (total 8 lanes) |
| 07. |
Foundations : |
Open Foundations. |
| 08. |
Superstructure : |
Cast in Situ Box girders for all the spans. |
| 09. |
Traffic Movements : |
Refer traffic movement plan for directions |
| |
A) |
Main Flyover : |
Traffic from Airport to Worli (Planned) Presently from Airport to Reclaimation (temporary access) Traffic from Worli to Airport. (Planned) Presently from Reclaimation to Airport |
| |
B) |
Ramp – A : |
Traffic from Andheri to Worli. (Planned) Presently from Andheri to Reclaimation |
| |
C) |
Ramp – B : |
Traffic from Airport to Mahim. |
| |
D) |
Ramp – E : |
Traffic from Andheri to Andheri & Reclamation. |
| |
E) |
Ramp – F : |
Traffic from Mahim to Worli.(Planned) Presently from Mahim to Reclaimation |